Code Compliance & Accessibility
Code Compliance & Accessibility
Clarity Upfront and Fewer Problems Downstream.
Code compliance and accessibility are often treated as boxes to check late in the process. In reality, they are foundational to how a site functions, performs, and ultimately gets approved.
At T.H. Norton Landscape Architecture, we integrate compliance early, aligning site design with ADA requirements, California regulations, and local agency expectations to avoid costly redesigns, delays, and field conflicts.
ADA Accessibility (Site + Landscape)
Accessibility is not just about slopes and dimensions, it’s about how people actually move through and experience a space.
We focus on practical, buildable solutions that meet ADA requirements while maintaining design intent.
Key Areas of Focus:
Accessible routes, slopes, and cross slopes
Site arrival sequences (parking, drop-off, transitions)
Ramps, handrails, and landings
Detectable warnings and surface treatments
Accessible outdoor amenities (seating, gathering spaces, recreation)
Integration with building thresholds and finished floor elevations
Why it matters:
Accessibility issues are one of the most common causes of plan check comments, field corrections, and failed inspections. Addressing these early avoids rework and liability exposure.
California Code Compliance
California projects come with layered regulatory requirements that impact site design, documentation, and approvals.
We work within these frameworks from the start—not as an afterthought.
Relevant Codes & Standards Include:
California Building Code (CBC) – Site accessibility
CALGreen requirements
Local municipal codes and ordinances
Agency-specific requirements (DSA, Planning, Building, Public Works, etc.)
Our Approach:
Coordinate early
Align grading, drainage, and access with compliance requirements
Provide clear, coordinated for plan check
MWELO Compliance
(California Model Water Efficient Landscape Ordinance)
California Model Water Efficient Landscape Ordinance compliance is often underestimated, and frequently becomes a bottleneck at plan check or final inspection.
We integrate MWELO requirements into the design process from day one to avoid delays and resubmittals.
Scope of Services:
Landscape documentation packages
Water budget calculations (MAWA / ETAF)
Hydrozoning strategies
Irrigation system design and efficiency planning
Soil management reports coordination
Certificate of completion support
Common Pitfalls We Help Avoid:
Incomplete or inconsistent water budget calculations
Misalignment between planting and irrigation design
Missing documentation at final inspection
Late-stage revisions to meet compliance thresholds
The Downstream Problem (and How We Solve It)
Too often, landscape and irrigation compliance are addressed late, after grading, architecture, and utilities are already fixed.
That’s when problems show up:
ADA conflicts with finished grades
Irrigation layouts clashing with utilities
MWELO calculations not aligning with actual design
Delays at plan check or final sign-off
Our role is to resolve these issues before they happen.
By integrating compliance early, we help:
Reduce change orders
Streamline approvals
Improve constructability
Keep projects moving toward occupancy
Where This Applies
Our compliance and accessibility work supports a range of project types, including:
Healthcare and assisted living facilities
Educational and public agency projects
Cemetery and memorial developments
Hospitality and commercial sites
Civic and community spaces
Let’s Get It Right Early
If you're navigating code requirements, accessibility challenges, or MWELO compliance, we can help bring clarity to the process and reduce risk moving forward.

